offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›BBB, MECAL & EP4 Complete Technical Due Diligence of the Dan Tysk Offshore-Wind Farm (Germany)

On behalf of Stadtwerke München (Munich city utilities; SWM), the TDD team of BBB Umweltechnik, MECAL Wind Farm Services and EP4 Offshore have accomplished the technical evaluation of the offshore wind farm „DanTysk“. DanTysk has a planned capacity of up to 288 MW and will be one of the first large scale farms to be built in the German Territorial Waters. The wind farm is to be realised in the North Sea 70 kilometres west of the island of Sylt with water depths of up to 30 metres.

During the due diligence the project team was responsible for reviewing all Vattenfall technical documentation and assessing the viability of the wind farm. Key items addressed in the due diligence were yield estimations, electro technical concept, technical aspects of all relevant licenses, consents and evaluation of the key project contracts along with logistics, construction and operation concepts. In addition to this was the verification of the associated assumptions for CAPEX and OPEX.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

The first of the 80 wind turbines will be commissioned in 2013. With the acquisition of a 49% share in the project SWM is making a big step towards its objective to cover the whole demand for electricity in Munich with green energy from its own power stations by 2025.

MECAL (MECAL Wind Farm Services)

MECAL is an independent engineering company, operating on a global scale and offering a wide range of services and products in the Semiconductor Industry, Wind Energy, and Vision & Optronics. We are headquartered in Enschede, the Netherlands. With more then 130 experienced professionals working world-wide, we have offices in the Netherlands, USA, and Japan.

In the Wind Energy market, we continue to help our customers – major wind turbine manufacturers, developers, utilities, and wind farm owners – to maximize their return on investments by increasing performance and enhancing the lifespan of the wind turbine(s).

[mappress]

Source: mecal, November 12, 2010;

News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

News

November 12, 2010 · about 15 years ago

BBB, MECAL & EP4 Complete Technical Due Diligence of the Dan Tysk Offshore-Wind Farm (Germany)

On behalf of Stadtwerke München (Munich city utilities; SWM), the TDD team of BBB Umweltechnik, MECAL Wind Farm Services and EP4 Offshore have accomplished the technical evaluation of the offshore wind farm „DanTysk“. DanTysk has a planned capacity of up to 288 MW and will be one of the first large

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team