offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›The Nederland: Eneco to Purchase Half Electricity Produced by C-Power Wind Farm
Business & Finance

December 23, 2010 · about 15 years ago

The Nederland: Eneco to Purchase Half Electricity Produced by C-Power Wind Farm

Eneco has announced that it will purchase half of all the electricity generated by the planned second phase of the offshore C-Power Wind Farm on a long term basis. The wind farm is located on the Thornton Bank at a distance of approximately 30 kilometres off the Belgian coast and currently has a pro

2 minutes read
  • LinkedIn
  • X
  • Email

Eneco has announced that it will purchase half of all the electricity generated by the planned second phase of the offshore C-Power Wind Farm on a long term basis.

The wind farm is located on the Thornton Bank at a distance of approximately 30 kilometres off the Belgian coast and currently has a production capacity of 30 MW for which Eneco had already concluded a long term contract. With the new contract, Eneco exceeds the 1000 MW limit in terms of available wind energy production capacity, Eneco said.

C-Power’s Belgian offshore wind farm will be expanded with a capacity of 295 MW, 147.5 MW of which will be purchased by Eneco on a long term basis. Currently, C-Power produces 30 MW for Eneco. With the new contract, the volume of sustainable energy production from wind turbines that is available to Eneco increases to 1,050 MW; a memorable step towards achieving the company’s sustainability objectives.

For the expansion of the wind farm, C-Power has selected 6.15 MW wind turbines (first in the world) produced by the German company REpower that also supplied the 5 MW turbines that are currently being used. The C-Power Wind Farm expansion will be financed by ten financial institutions, including the Dutch banks Rabobank and ASN Bank, which will provide them with facilities totalling EUR 869 million (see C-Power press release of 25 November), the company added.

“The existing operational relationship between Eneco and C-Power and Eneco’s unique market knowledge in the field of wind energy formed the basis for this success”, says Eneco board member Kees-Jan Rameau. C-Power CEO Filip Martens supports this with his statement that: “The good exchange of experience with Eneco during the first (30 MW) phase of the C-Power project created an excellent basis to broaden our cooperation significantly (+ 147.5 MW) for the next phase of the Thornton Bank project.”

[mappress mapid=”1932″]

Source: istockanalyst, December 23, 2010

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & Finance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago
Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

26 days ago