offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Vestas Finishes 2010 With Record Order Intake in North America
News

January 6, 2011 · about 15 years ago

Vestas Finishes 2010 With Record Order Intake in North America

Vestas finished 2010 with a record number of wind-turbine sales in North America — 15 total — resulting in 1,883 megawatts and 871 wind turbines. This was the best sales performance for the region since Vestas entered the North American market in 1981. Vestas’ previous sales record for North America

2 minutes read
  • LinkedIn
  • X
  • Email

Vestas finished 2010 with a record number of wind-turbine sales in North America — 15 total — resulting in 1,883 megawatts and 871 wind turbines.

This was the best sales performance for the region since Vestas entered the North American market in 1981. Vestas’ previous sales record for North America was 1,554 megawatts in 2007. Other highlights in 2010 include:

* Ten orders from U.S. customers (1,513 MW), five orders from Canadian customers (370 MW)

* The largest order for a single site — 190 V90-3.0 MW turbines for Terra-Gen’s Alta Wind Energy Center in California

* A five-year service contract renewal for 429 MW with Puget Sound Energy, the leading utility in Washington

“These achievements are particularly noteworthy given the economic challenges facing the wind business and many other industries since 2008,” said Martha Wyrsch, who became President of Vestas Americas in mid-2009. “In the last few years, we have focused on lowering the cost of energy for our customers through regional manufacturing and local sourcing of parts, and by increasing energy production through preventative turbine maintenance.”

The strong order intake has kept Vestas’ three Colorado manufacturing facilities busy and helped create more than 700 jobs in that state in 2010.

* Vestas’ blade factory in Windsor, which opened in 2008, added almost 200 jobs in 2010 to bring its employee total to nearly 700 people.

* Vestas’ nacelle factory in Brighton, which officially opened in 2010, added about 220 jobs to the Colorado economy this year and now has more than 300 employees.

* Vestas’ tower factory in Pueblo began operations in early 2010 and has added about 300 jobs in recent months, increasing its employee base to 430.

In July, Vestas established a new engineering office in Louisville, Colo., transferring 46 existing Technology Research & Development employees, who were temporarily housed at the Brighton nacelle factory, to the new office space. Since then, this new research and development facility has nearly doubled its workforce. These highly skilled positions include engineers and scientists who are working to improve technology for existing Vestas turbines and develop future wind-power systems.

Altogether, Vestas employs about 3,000 people in North America, including more than 1,600 in Colorado. More than 600 employees provide service and maintenance for customers’ turbines in 20 U.S. states and all 10 Canadian provinces.

In 2011, Vestas will open an additional blade factory in Brighton that is expected to employ at least 600 people when at full operating capacity. The Brighton blade factory will be equipped to manufacture blades for the new V112-3.0 MW, which was released for sale in 2010.

[mappress]

Source: vestas, January 06, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago