AMC Connector, a future new-build subsea installation and construction vessel from Aker Solutions, has finalised its vessel specs. With a total payload capacity of 9 000 tonnes of subsea power cables or umbilicals, the vessel will be well equipped to target the deepwater installation segment.
AMC Connector – previously called Aker Connector – will be equipped with two turntables for high voltage power cables or subsea umbilicals: one 6 000 tonnes capacity on deck and another 3 000 tonnes capacity below deck. With a total product payload of 9 000 tonnes, AMC Connector will be able to take on highly complex and sizeable installation projects.