offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Turbine Access System Developed by Houlder Will Be Present at EWEA 2011 (Belgium)
News

February 23, 2011 · about 15 years ago

Turbine Access System Developed by Houlder Will Be Present at EWEA 2011 (Belgium)

UK employee owned marine engineering company Houlder has announced that the Turbine Access System (TAS) being jointly developed with BMT Nigel Gee to provide safe personnel access to offshore wind turbines will feature in a visual presentation at the EWEA 2011 Conference in Brussels. The patented ac

2 minutes read
  • LinkedIn
  • X
  • Email

UK employee owned marine engineering company Houlder has announced that the Turbine Access System (TAS) being jointly developed with BMT Nigel Gee to provide safe personnel access to offshore wind turbines will feature in a visual presentation at the EWEA 2011 Conference in Brussels.

The patented access platform technology is already strongly supported by industry including developers’ and vessel operators’ in recognition of both the significant safety improvement and increased maintenance window it provides from workboats in rougher weather.

Preliminary analysis also indicates its greater transfer capability will have a substantial beneficial impact on the bottom line over present arrangements.

Increasing the significant wave height window for personnel transfer from 1.5m to 2.0m, for example, allows quick resets and minor turbine repairs to be undertaken on a higher proportion of North Sea work days.

This uplift has been shown to improve turbine availability from 80 per cent to 90 per cent, which for a 5MW turbine, as expected to be deployed for much of UK Round 3 developments, equates to extra annual revenue of £245k per turbine.

Taking the proposed 9GW Dogger Bank field as the most onerous example, this equates to a possible additional revenue of £441 million a year.

Currently in detailed design phase, Houlder is already talking to field developers and stakeholders about delivering the first TAS units in the third quarter this year.

As well as appearing at EWEA next month, Houlder plan to promote the system in the UK at Southampton’s SeaWork International Exhibition June 14-16th 2011.

[mappress]

Source: houlderltd February 23, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago