offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›GL Garrad Hassan to Take Part in EWEA 2011 (Belgium)
Business & Finance

March 9, 2011 · about 15 years ago

GL Garrad Hassan to Take Part in EWEA 2011 (Belgium)

Offshore wind energy project developers and prospectors are challenged to affordably acquire accurate, on-site wind data to assess the viability of a proposed or potential project. In his presentation at EWEA 2011 in Brussels, Daniel Jaynes, GL Garrad Hassan, takes a closer look on the efficacy of f

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore wind energy project developers and prospectors are challenged to affordably acquire accurate, on-site wind data to assess the viability of a proposed or potential project. In his presentation at EWEA 2011 in Brussels, Daniel Jaynes, GL Garrad Hassan, takes a closer look on the efficacy of floating LIDAR motion compensation algorithms for offshore wind resource assessment applications.

The presentation will be held on Monday, 14.03.2010, 16:00 – 17:00 at EWEA 2011.

Because many offshore wind farm projects are in stages of early design, inexpensive wind measurement alternatives to costly meteorological masts have received attention from the growing offshore wind energy project planning community. In recent years, LIDAR remote sensing technology has emerged as an alternative due to the advent of systems that allow deployment in offshore environments by mounting them on floating buoys, equipped with motion compensation algorithms to account for the dynamic nature of the buoy.

This investigation aims to explore the accuracy and value of floating LIDAR systems by studying the efficacy of the motion compensation algorithms that are applied to correct wind data recorded by such devices. An experimental study is presented that demonstrates the comparison of high quality, calibrated wind speed measurements from a well-equipped meteorological mast and measurements supplied by a nearby floating LIDAR unit.

The measurement campaign consists of two phases. First, the LIDAR system is deployed in a stationary, on-shore configuration near an operational met tower to establish a frame of reference. Second, the floating buoy system is deployed in a nearby offshore environment where the role of motion compensation algorithms can be assessed relative to measurements collected at the same nearby meteorological mast. The results of this analysis help demonstrate the potential that floating LIDAR systems have for offshore wind resource assessment applications.

Further GL Garrad Hassan presentations at EWEA 2011 conference in Brussels:

Jonathan Collins – Increasing Certainty: Combination methods for reliable probabilistic wind production forecasts

Date: Tuesday, 15.03.2010, 16:00 – 17:30 (Theme: Wind Resource)

Joel Manning – Validation and challenges of CFD in complex terrain for real world wind farms

Date: Wednesday, 16.03.2010, 9:00 – 10:30 (Theme: Wind Resource)

Michael Wilkinson – Measuring wind turbine reliability – results of the reliawind project

Date: Wednesday, 16.03.2010, 9:00 – 10:30 (Theme: Technology)

[mappress]

Source: gl-garradhassan, March 09, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & Finance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

27 days ago