offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›ABPmer Publishes Appraisal About Effect on European Designated Sites (UK)
News

March 22, 2011 · about 15 years ago

ABPmer Publishes Appraisal About Effect on European Designated Sites (UK)

An appraisal undertaken by ABPmer for Marine Scotland, that considers the effect on European designated sites of planned offshore wind developments in Scottish Waters, has recently been published. The Scottish Government has prepared a draft Plan which considers the potential of Scottish Territorial

2 minutes read
  • LinkedIn
  • X
  • Email

An appraisal undertaken by ABPmer for Marine Scotland, that considers the effect on European designated sites of planned offshore wind developments in Scottish Waters, has recently been published.

The Scottish Government has prepared a draft Plan which considers the potential of Scottish Territorial Waters to accommodate Offshore Wind Energy. ABPmer was commissioned to complete a Habitats Regulations Appraisal (HRA) of this Plan in accordance with the requirements of the EC Habitats Directive.

Dr Stephen Hull, Director ABPmer , said: “ Based on established guidance for undertaking Plan-level HRAs, ABPmer carried out an auditable assessment process to determine whether the Plan will have a ‘likely significant effect’ on sites designated for their nature conservation interest at a European Level and then assessed whether the integrity of these sites will be adversely affected. Where it could not be determined that there would be no adverse effect on integrity then mitigation measures were identified for each of the impact pathways to seek to avoid any adverse effect. Adopting a precautionary approach, as required by the Habitats Directive, the study considered potential impacts to over 370 designated sites which were screened into the assessment, including sites as far away as Northern Ireland, the Irish Republic, England and Wales for some species of marine birds. ”

The Appraisal will inform the Appropriate Assessment that Marine Scotland, as competent authority, needs to prepare prior to adopting the draft Plan for Offshore Wind Energy.

( abpmer )

[mappress]

Source: abpmer , March 22, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago