offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›ODE Wins Contract for Two Gwynt y Môr Substation Platforms (UK)
News

April 5, 2011 · about 15 years ago

ODE Wins Contract for Two Gwynt y Môr Substation Platforms (UK)

International engineering contractor Offshore Design Engineering Ltd (ODE) has been awarded a new six-figure contract by Burntisland Fabricators (BiFab) to provide the engineering and design of two substation platforms for a wind farm off the North Wales coast. ODE will produce the detailed design o

1 minutes read
  • LinkedIn
  • X
  • Email

International engineering contractor Offshore Design Engineering Ltd (ODE) has been awarded a new six-figure contract by Burntisland Fabricators (BiFab) to provide the engineering and design of two substation platforms for a wind farm off the North Wales coast.

ODE will produce the detailed design of the jacket and primary steel design as well as the secondary and tertiary structure of the substations for NPower Renewables’ Gwynt y Môr offshore wind farm.

BiFab are responsible for the design, supply and fabrication of jacket foundations for the substation platforms.

ODE chairman and managing director, Peter Godfrey , said: “After the success of providing BiFab with detailed engineering and design of the Greater Gabbard wind farm transformer jackets and the Ormonde SSP substructure design, we are delighted to be working with our partners once again. We have already made a start on the basic engineering and are collaborating with the various third parties to ensure the design is optimised.”

Gwynt y Môr Offshore Wind Farm Limited was set up by Npower Renewables Limited and will develop a site 13km offshore from the North Wales coast stretching from Prestatyn to Colwyn Bay. The new wind farm will consist of 160, 3.6MW wind turbine generators with a gross output of 576MW.

[mappress]

Source:ode-ltd , April 05, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago