offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Marine Designs Limited to Install Dockmaster Pontoon System Within Grimsby Fish Docks (UK)
News

June 24, 2011 · about 15 years ago

Marine Designs Limited to Install Dockmaster Pontoon System Within Grimsby Fish Docks (UK)

Marine Designs Limited, a subsidiary of A&P Group, announced at this month’s Seawork International 2011 exhibition that it has been awarded a contract to build and install their award winning Dockmaster pontoon system within the Grimsby Fish Docks. As part of an ongoing agreement between the Grimsby

1 minutes read
  • LinkedIn
  • X
  • Email

Marine Designs Limited, a subsidiary of A&P Group, announced at this month’s Seawork International 2011 exhibition that it has been awarded a contract to build and install their award winning Dockmaster pontoon system within the Grimsby Fish Docks.

As part of an ongoing agreement between the Grimsby Fish Dock Enterprise and Centrica the companies will use the pontoons as a docking station to enable the safe transfer of offshore and marine personnel from port to their offshore wind farm. Six of the innovative Dockmaster concrete pontoon units will be supplied by September 2011.

Drystan Jones, Managing Director of Marine Designs Ltd commented, “We installed the crew transfer pontoons in Grimsby in 2007, which have been used for the transfer of the offshore wind technicians from up to four boats at a time, saving time and money for the operators. We are delighted that we can continue to be involved in the development of Grimsby Fish Docks, and we look forward to returning to the port later this year to install the new pontoons.”

The contract follows the completion of a contract by Marine Designs Ltd for ABP where 50 metres of additional pontoon has been installed to extend the deep water berth facilities at ABP’s Barrow dock. This allows access for operation and maintenance to off shore turbines in this region.

[mappress]

Source: ap-group, June 24, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago