offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Siemens to Equip Offshore Wind Turbine Installation Vessel (Germany)
News

July 20, 2011 · about 15 years ago

Siemens to Equip Offshore Wind Turbine Installation Vessel (Germany)

J. J. Sietas KG of Hamburg is the first German shipyard to build an installation vessel for the erection of offshore wind farms. Siemens Marine Solutions will supply the appropriate diesel-electric propulsion and automation system as well as the medium voltage system for power generation and distrib

2 minutes read
  • LinkedIn
  • X
  • Email

J. J. Sietas KG of Hamburg is the first German shipyard to build an installation vessel for the erection of offshore wind farms.

Siemens Marine Solutions will supply the appropriate diesel-electric propulsion and automation system as well as the medium voltage system for power generation and distribution. The order has a value of several million euros. The special vessel is due to be handed over to Van Oord, a Dutch water engineering company, in September 2012.

J. J. Sietas KG Schiffswerft GmbH u. Co. is a shipbuilding company located in Hamburg-Neuenfelde, which specializes in building special, innovative, industrial ships. It is the first German shipyard to build an installation ship for erecting of offshore wind farms. It will be used by the Van Oord Group for its offshore projects in the North and the Baltic Sea. The order for the electrical equipment was awarded to a project consortium comprising Siemens AG, Siemens Norway and INTERSCHALT maritime systems AG. The scope of supply from Siemens includes the main generators and the distribution transformers for the ship’s medium-voltage distribution, the switchgear and the power management system. Siemens is also delivering the medium voltage transformers and drives for the bow thrusters and the soft starters, as well as the motors for the main propulsion system. Siship Imac, the Siemens ship automation system, will be installed to handle the monitoring, alarm and control functions of the on-board electrical systems.

The company will also be responsible for the project management, engineering and commissioning of the complete diesel-electric propulsion system. All the systems and components used are part of the Siemens Siship solution platform.

The special vessel with a carrying capacity of up to 6,500 tons (dead weight tonnage) is designed for transporting and installing offshore wind power plants. It is intended for use in offshore wind farms located at a distance from the coast. With a length of 139 meters and a width of 38 meters, the ship will be able to work in waters up to 45 meters deep. Furthermore it will have a draft of 5.70 meters and a speed of twelve knots. The special on-board crane will be able to lift 900 tons with an outreach of 30 meters, and work up to a height of about 120 meters above water level. During the installation work in the wind power farms, the ship’s crew of 74 will be accommodated in single and double cabins.

[mappress]

Source: siemens, July 20, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago