offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›UK: Forewind Appoints Atkins to Design Met Masts for Dogger Bank Offshore Wind Farm
Operations & Maintenance

August 23, 2011 · about 15 years ago

UK: Forewind Appoints Atkins to Design Met Masts for Dogger Bank Offshore Wind Farm

Forewind has appointed Atkins to design the Meteorological (Met) masts for the Dogger Bank offshore wind farm which is located off the east coast of Yorkshire and is potentially the largest offshore wind farm in the world. The masts will gather important meteorological data to help ensure that the w

2 minutes read
  • LinkedIn
  • X
  • Email

Forewind has appointed Atkins to design the Meteorological (Met) masts for the Dogger Bank offshore wind farm which is located off the east coast of Yorkshire and is potentially the largest offshore wind farm in the world. The masts will gather important meteorological data to help ensure that the wind turbines are designed and orientated to maximise the farm’s power generating capacity.

Project director for Atkins, John Foley , said: “ Met masts provide valuable information for characterising the long term environmental conditions and wind resource that inform the economic viability of a wind project. The robustness of the data relies upon the robustness of the Met masts – as they are to be located in the challenging conditions of deep water and will need to pick up the desired higher wind speeds, the teams will rely on key experience and skills being tested in the industry.”

Dogger Bank has a potential capacity of around 13GW, equal to around 10% of the UK’s projected electricity future requirements. Atkins’ initial role is to conduct the conceptual appraisal for the Met mast sub-structures which will be located in water depths of 22m and 25m. Once the concept is approved, Atkins’ team will also carry out the detailed design for the foundation and topsides.

Peter Geddes, Forewind project manager , said: “ The remote location, harsh environment and testing economic climate present some complex engineering challenges that we are confident Atkins has the expertise to address.”

This contract builds on similar work Atkins is undertaking for six other Met mast projects in the UK including the Narec Demonstrator Project Monitoring Station, and Rampion, just off the UK’s south coast.

[mappress]

Source: Atkins, August 23, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago