offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Scira Offshore Energy Evacuates Ill Supplier (UK)
News

September 11, 2011 · about 15 years ago

Scira Offshore Energy Evacuates Ill Supplier (UK)

A contractor for one of the wind farm’s construction suppliers fell ill due to a non-work related condition onboard the floating hotel “Wind Ambition” and had to be airlifted to hospital. The Coastguard was telephoned early in the morning following a diagnosis from the onboard medic that the contrac

2 minutes read
  • LinkedIn
  • X
  • Email

A contractor for one of the wind farm’s construction suppliers fell ill due to a non-work related condition onboard the floating hotel “Wind Ambition” and had to be airlifted to hospital.

The Coastguard was telephoned early in the morning following a diagnosis from the onboard medic that the contractor required urgent medical assistance. Due to high sea conditions at the time, the crew transfer vessels that would usually be used in this situation were not suitable and a helicopter was called in to perform a medical evacuation.

The contractor was successfully flown to Norfolk and Norwich Hospital for treatment, where he had an operation early this morning, and has now been cleared for discharge. He will be recuperating with family for a few weeks before returning to work.

Scira General Manager Einar Strømsvâg said that it was a credit to all involved that the rescue operation was carried out smoothly and efficiently. “While this was a successful test of our health and safety procedures, it is a reminder that we must continue to put health and safety at the core of our operations,” he said. “We wish the contractor a rapid recovery from his illness.”

A further incident occurred at approximately 7.57am this morning, the Scira Marine Coordination Centre received notification that a contractor from an infield construction vessel responsible for secondary works on the Sheringham Shoal Wind Farm, had been injured during a routine diving operation. The fully conscious injured party was recovered back on board the vessel, to receive immediate attention and assessment from the onboard doctor. The Coastguard was informed, and the contractor was airlifted off the vessel by helicopter to Norwich hospital. He has since been discharged after a thorough examination and treatment for a bruised leg.

Work on the specific operation in question has been suspended pending a full investigation of the incident in accordance with Scira’s strict HSE procedures. The Health & Safety Executive has been notified. Construction work on the remainder of the site continues as normal.

Scira General Manager Einar Strømsvâg, said that the swift response again demonstrates the effective Emergency Response protocols in place on Sheringham Shoal Wind Farm and the very good cooperation with the Coastguard.

[mappress]

Source: scira, September 12, 2011;

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago