offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Texas Company Signs MoU With Eolica Brasil Over Mobile Offshore Jack-up Platform (USA)
Technology

September 23, 2011 · about 15 years ago

Texas Company Signs MoU With Eolica Brasil Over Mobile Offshore Jack-up Platform (USA)

A Texas company has signed a memorandum of understanding (MoU) with private wind developer Eolica Brasil over the supply of a mobile offshore jack-up platform for meteorological testing off the Brazilian state of Ceara The MoU gives the Brazilian firm and Offshore Wind Power Systems of Texas, based

2 minutes read
  • LinkedIn
  • X
  • Email

A Texas company has signed a memorandum of understanding (MoU) with private wind developer Eolica Brasil over the supply of a mobile offshore jack-up platform for meteorological testing off the Brazilian state of Ceara

The MoU gives the Brazilian firm and Offshore Wind Power Systems of Texas, based in Dallas, one year to negotiate the platform sales contract.

The meteorological test site is within an area between five and 25km from the shore where Eolica Brasil wants to locate its multi-billion-dollar Asa Branca wind project. The company has obtained necessary marine, aviation and environmental permits, according to chief executive Marcello Storrer Prado Garcia.

The two sides will collaborate on site-specific platform design, manufacture, assembly, installation and delivery. The document leaves open the possibility of further sales of platforms as needed for Asa Branca.

Eolica Brasil would equip the Y-shaped Titan 200 model platform with a meteorological mast, a range of weather sensors, avian radar, oceanographic devices, soil boring equipment, and small wind and solar-energy generators.

Water depths in the Asa Branca site are less than 30 meters. The Titan 200 has design capacity to lift the heaviest wind turbine in use today and those planned up to 10MW in a maximum 100 meters of water, according to Offshore Wind Power Systems chief executive Doug Hines. Plans call for Asa Branca to use 5MW turbines which would require a Titan platform of 1,800 tonnes steel for support.

Hines says the Titan 200 can be assembled either in a dry dock or on a dock, and quayside infrastructure exists along the northern Brazil coast to do this. Once the jack up platform is assembled, the met mast or turbine is then erected on the hull. In a 2010 interview with Recharge, Garcia said he was four years from starting construction of the pioneering Asa Branca project.

[mappress]

Source: pr, September 23, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

20 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

20 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago