offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›New GL Technical Note on Turbine Operation in Cold Climates (Germany)
News

October 7, 2011 · about 15 years ago

New GL Technical Note on Turbine Operation in Cold Climates (Germany)

As wind energy is being called to provide a greater share of the world’s energy burden, more turbines are operating in areas where temperature tests the machinery to its limits. Wind turbines are usually designed to operate in a temperature range from –10°C to +40°C, but at some current installation

2 minutes read
  • LinkedIn
  • X
  • Email

As wind energy is being called to provide a greater share of the world’s energy burden, more turbines are operating in areas where temperature tests the machinery to its limits.

Wind turbines are usually designed to operate in a temperature range from –10°C to +40°C, but at some current installations temperatures can drop to -30°C or -40°C. To ensure that operators rely on turbine operation in cold climates GL Renewables Certification (GL) has issued an update to its technical note “Certification of Wind Turbines for Extreme Temperatures.”

Building on previous revisions and the knowledge gained through both project experience and cold chamber testing, and also taking into account the new GL Guideline for the Certification of Wind Turbines 2010, this is the fourth revision of the note since its introduction. GL first issued the note in 2005 and has been continually revising and updating it ever since, to reflect advances in technology and growing expertise gained through the continued testing of turbines in extreme temperatures, both in the field and in the lab.

The latest technical note provides information on load assumptions, safety and control systems, manuals, rotor blades, nacelle covers and spinners, machinery components, strength verification, building structures, and electrical installations.

A site is considered a cold climate site if minimum temperatures of below -20°C have been observed during long term measurements on an average of more than nine days a year, for a minimum of one hour. If a site fulfils these conditions then cold climate requirements should be considered in the design of the turbine.

GL Renewables Certification has a long history of working with turbines under such extremes of temperature, having certified several projects in sub-artic areas, including Rushlake Creek in Saskatchewan, Canada as well as the Chanarambie, Viking and Stoneray projects in Minnesota, USA. Furthermore, many components and wind turbines have been assessed successfully based on former editions of this Technical Note.

About GL Renewables Certification

GL Renewables Certification, part of the GL Group, is a leading certification body primarily focussed on the certification of wind farms, wind turbines and their components. At the forefront of understanding in renewables technology, it is abreast of all the necessary standards and requirements and takes a harmonised approach in ensuring that these are met. Manufacturers, banks and insurers around the world rely on the state-of-the-art service provided by GL Renewables Certification.

[mappress]

Source: gl-group, October 07, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago