offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Tentec Bolt Tensioners Pass Offshore Trials with Flying Colours (UK)
Technology

October 19, 2011 · about 14 years ago

Tentec Bolt Tensioners Pass Offshore Trials with Flying Colours (UK)

Tentec’s Aero range of bolt tensioning equipment for the installation and maintenance of wind turbines are now the tools of choice for installation and maintenance engineers on the world’s largest operational offshore wind farm – Thanet. Following highly successful trials, comments on the bolt tensi

1 minutes read
  • LinkedIn
  • X
  • Email

Tentec’s Aero range of bolt tensioning equipment for the installation and maintenance of wind turbines are now the tools of choice for installation and maintenance engineers on the world’s largest operational offshore wind farm – Thanet.

Following highly successful trials, comments on the bolt tensioning equipment from Tentec include “the tools have proven to be of better quality and handling than the ones we have previously used offshore”, “easier to handle”, faster to build up pressure” and “saves time”.

Since the launch of this innovative range, engineers throughout the world have used the bolt tensioning tools mainly for onshore construction and servicing. However, with this ringing endorsement, Tentec is confident that more offshore operators will consider the use of the Tentec Aero equipment.

“We have been very successful in gaining new contracts for onshore projects.” explains Roy Sheldon, Sales Director at Tentec. “We are delighted that the tools are now in regular use on offshore developments as well.”

The installation team at the Thanet Offshore Wind Farm now holds a substantial number of Tentec’s bolt tensioners for regular maintenance and repair work on the offshore turbines.

[mappress]

Source: tentec, October 19, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

20 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

20 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago