offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Restrictions on Access to Working Area Takes Effect (Denmark)
News

November 2, 2011 · about 14 years ago

Restrictions on Access to Working Area Takes Effect (Denmark)

As of 1 November 2011, the naval authorities have formally approved the area around Anholt Offshore Wind Farm to be a ‘restricted area at sea’. This means that as of 1 November 2011, navigation, anchoring, fishing, diving and works at the seabed, which are not related to the construction of the wind

1 minutes read
  • LinkedIn
  • X
  • Email

As of 1 November 2011, the naval authorities have formally approved the area around Anholt Offshore Wind Farm to be a ‘restricted area at sea’. This means that as of 1 November 2011, navigation, anchoring, fishing, diving and works at the seabed, which are not related to the construction of the wind farm, are prohibited.

All mariners have been notified of the restriction area through ‘Efterretninger for Søfarende’ (Notice to mariners), EfS 40/1100 2011.

The restricted area is maintained to increase the navigation safety in the area. Though the installation of foundations and wind turbines will not commence until the change of the year, several vessels are already working in the area: Large stones are removed from the seabed and stone reefs are constructed; erosion protection is laid and supplementary seabed investigations are conducted.

During November, the working area will be marked with light buoys, and all mariners have been notified about the establishment of the restricted area through ‘Notice of mariners’. Special-purpose vessels will be placed in the area to monitor the shipping traffic in and around the area and to document any violation.

[mappress]

Source: dongenergy, November 02, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago