offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›EnBW Looks for Monitoring Contractor for Duration of EnBW Baltic 2 Construction (Germany)
News

November 18, 2011 · about 14 years ago

EnBW Looks for Monitoring Contractor for Duration of EnBW Baltic 2 Construction (Germany)

Karlsruhe based publicly traded electric utilities company, EnBW, is looking for contractor for monitoring during the construction of offshore wind farms ‘EnBW Baltic 2’, including all necessary logistical and technical services. The scope of investigations are related to sediment and habitat struct

1 minutes read
  • LinkedIn
  • X
  • Email

Karlsruhe based publicly traded electric utilities company, EnBW, is looking for contractor for monitoring during the construction of offshore wind farms ‘EnBW Baltic 2’, including all necessary logistical and technical services.

The scope of investigations are related to sediment and habitat structures, habitat use, hydrographic, benthos, fish, marine fauna (continual users and migration movements), marine and underwater noise emissions according to the BSH- Standard’s studies of the effects of offshore wind turbines on the marine environment.

About EnBW Windpark Baltic 2:

Project starts on 1.7.2012., and it’s due to be completed on 30.6.2014.

EnBW Baltic 2 is four times as big as EnBW Baltic 1 – and will generate six times as much electricity. That sets requirements regarding planning and logistics in every respect.

Wind farm is located in the Baltic Sea, 32 km north of the island of Rügen.

The depth of the sea varies between 23 and 44 meters. Depending on this depth, the installations are mounted either on steel piles, so-called monopiles (up to 35 meters deep) or steel-framework-structures, so-called jackets (starting from a depth of 35 meters).

With a yearly output of about 1.2 billion kWh EnBW’s Wind park Baltic 2 is able to provide electricity for about 340,000 households per year. By this, 900,000 tons CO2 can be saved.

[mappress]

Offshore WIND staff, November 18, 2011; Image: EnBW

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago