offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›BTC and WINDEA Working on Planning Tool for Offshore Wind Energy Sector (Germany)
News

November 20, 2011 · about 14 years ago

BTC and WINDEA Working on Planning Tool for Offshore Wind Energy Sector (Germany)

The BTC Business Technology Consulting AG (BTC) and WINDEA Offshore GmbH & Co. KG (WINDEA) are willing to work together for an extensive planning and coordination tool for the offshore windenergy sector. The WINDEA with its domicile in Hamburg is currently working on a coordination tool for its serv

2 minutes read
  • LinkedIn
  • X
  • Email

The BTC Business Technology Consulting AG (BTC) and WINDEA Offshore GmbH & Co. KG (WINDEA) are willing to work together for an extensive planning and coordination tool for the offshore windenergy sector.

The WINDEA with its domicile in Hamburg is currently working on a coordination tool for its services in the offshore wind sector. This so called Offshore Coordination Center (OCC) will be the center for all operative and logistical activities ashore, at the water and in the air. WINDEA will use an IT-System to support the tasks of the OCC, which will be based on the BTC Wind Farm Center and the O&M-Manager of the WINDEA Technologie Service GmbH (WINDEA TS).

The BTC Wind Farm Center will coordinate the planning’s and operations of all offshore actions. This is to assure that the technician with the right qualification will be transferred with the best suited transfer vessel to the correct offshore construction at the right time.

The WINDEA TS O&M-Manager will support the technician at the construction site with animated 3D-illustrations of the particular task. So the O&M-Manager assures with its graphical and animated operation instructions a qualitative high execution of the task.

Due to the continuous IT-assistance of the processes, the WINDEA can offer its clients an efficient maintenance on a high quality level with an extensive, continuous growing Know-how.

WINDEA is exhibitor on the EWEA Offshore in Amsterdam from the 29th November till 01st December 2011. You can meet their experts and experts of BTC for the OCC personally at the exhibition in hall no. 10, stand no 10140

[mappress]

OffshoreWIND staff, November 21, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago