offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Fugro Completes Geotechnical Work for Arkona-Becken Südost (Germany)
News

December 2, 2011 · about 14 years ago

Fugro Completes Geotechnical Work for Arkona-Becken Südost (Germany)

The Fugro Consult GmbH was commissioned by E.ON for the geotechnical exploration for “Arkona-Becken Südost” offshore wind farm , which E. ON is planning to build in the Baltic Sea. Work was carried out in the summer and early fall of this year, and now has been completed in water depths of approxima

1 minutes read
  • LinkedIn
  • X
  • Email

The Fugro Consult GmbH was commissioned by E.ON for the geotechnical exploration for “Arkona-Becken Südost” offshore wind farm , which E. ON is planning to build in the Baltic Sea.

Work was carried out in the summer and early fall of this year, and now has been completed in water depths of approximately 22 to 37 m.

Fugro used:

– Seacore Excalibur, jackup barge

– Fugro Commander, geotechnical vessel

– Pauline, jack-up platform

The geotechnical investigation included 79 boreholes with depths of up to 60 m below the seabed.

In some locations for wind turbines and the substation CPTs tests were carried out with the Wison system.

[mappress]

Offshore WIND staff, December 02, 2011; Image: fugro

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago