offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›The Netherlands: Wind Turbines to Reach Capacity of 20MW by 2020
News

December 5, 2011 · about 14 years ago

The Netherlands: Wind Turbines to Reach Capacity of 20MW by 2020

In 2020 wind turbines will reach a capacity of 20 MW. This is the conclusion of a feasibility study conducted within Europe’s Upwind wind power project . Giant wind turbines, with rotor having a 200 meter diameter and a capacity of 20 MW will be put into service by 2020. Significant technological in

2 minutes read
  • LinkedIn
  • X
  • Email

In 2020 wind turbines will reach a capacity of 20 MW. This is the conclusion of a feasibility study conducted within Europe’s Upwind wind power project .

Giant wind turbines, with rotor having a 200 meter diameter and a capacity of 20 MW will be put into service by 2020. Significant technological innovation and design will be then necessary, according to a feasibility study for the Upwind wind power project.

This increased capacity could offer important opportunities for the expansion of wind energy in Europe, especially through the construction of offshore wind farm parks, thus making it possible to achieve the goal of obtaining 26% to 34% of Europe’s electricity demand from wind power by 2030.

However, significant technological advances will have to be made, and the design will have to change: “Making a 20 MW wind turbine is not just upscaling today’s 5 MW machines. Nevertheless, we have already identified the necessary innovations in terms of design, materials and way the turbine is operator” , said Jos Beurskens of the Energy Research Centre Netherlands , who led the project.

For example, the blades will have a 200 meter diameter, compared with the 120 meters of current 5 MW turbines, though they will be lighter and more flexible. Moreover, they will have to be equipped with sensors that will indicate in real time how they must be oriented to best exploit the wind and can also check their tension.

Moreover, economic issues must be overcome, as regards the of research and development funding.: “This knowledge will never become reality if the EU does not make a clear commitment to research,” warns Christian Kjaer, CEO of the European Wind Energy Association (EWEA).

[mappress]

Source: evwind, December 05, 2011

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago