offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Anholt Offshore Wind Farm Construction to Begin Soon (Denmark)
News

December 6, 2011 · about 14 years ago

Anholt Offshore Wind Farm Construction to Begin Soon (Denmark)

Now, the construction of Denmark’s largest offshore wind farm will soon begin. On Sunday 20 November 2011, the floating crane Svanen arrived at Grenaa Harbour, and next month it will be used to prepare the floating crane for the installation of the 111 monopiles to be driven into the sea bed. Svanen

2 minutes read
  • LinkedIn
  • X
  • Email

Now, the construction of Denmark’s largest offshore wind farm will soon begin.

On Sunday 20 November 2011, the floating crane Svanen arrived at Grenaa Harbour, and next month it will be used to prepare the floating crane for the installation of the 111 monopiles to be driven into the sea bed.

Svanen was built in Holland in 1990 for the construction of the Great Belt bridge, where its task was to lift the bridge spans on the western side into position as units of approx 6,000 tonnes each. Svanen is 103 metres long, 72 metres wide and 100 metres tall. Later, Svanen was used in connection with the construction of the Oresund bridge.

After a considerable upgrade in 1994, Svanen now has a lifting capacity of 8,700 tonnes and has just been involved in driving the monopoles at two of DONG Energy’s British offshore wind farms. Thus Svanen has placed the last 51 foundations in the Walney II Offshore Wind Farm and driven monopoles in the London Array Offshore Wind Farm.

Svanen is scheduled to leave Grenaa Harbour between Christmas and New Year to be ready at the first foundation position in the Anholt Offshore Wind Farm.

The first monopiles ready to be shipped from Bladt Industries in Aalborg

This very moment, the production of the monopiles is ongoing at Bladt Industries in Aalborg, and the first monopiles are ready for shipment. The monopiles are manufactured partly at Bladt Industries in Aalborg, partly at March Wind Technology in Herning which supplies the upper section with conic design.

At the same time, the contractor MT Højgaard is setting up the harbour area from where the monopiles are shipped.

[mappress]

Offshore WIND staff, December 06, 2011; Image: dongenergy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago