offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›GEO Carries Out Site Clearance Survey for Jack-up Platform Installation (Sweden)
News

December 15, 2011 · about 14 years ago

GEO Carries Out Site Clearance Survey for Jack-up Platform Installation (Sweden)

In connection with the service of turbines at Lillgrund Offshore Wind Farm, GEO carried out a Site Clearance Survey for a jack-up platform installation. GEO conducted a sidescan sonar survey at two foundations in order to identify objects that could hinder the installation of the jack-up platform. G

1 minutes read
  • LinkedIn
  • X
  • Email

In connection with the service of turbines at Lillgrund Offshore Wind Farm, GEO carried out a Site Clearance Survey for a jack-up platform installation.

GEO conducted a sidescan sonar survey at two foundations in order to identify objects that could hinder the installation of the jack-up platform. GEO was contracted by Siemens Wind Power A/S.

[mappress]

Offshore WIND staff, December 15, 2011; Image: vattenfall

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago