offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›nkt cables Lands EUR 20 Million Contract for Amrumbank West Offshore Wind Farm (Germany)
Grid Connection

December 15, 2011 · about 14 years ago

nkt cables Lands EUR 20 Million Contract for Amrumbank West Offshore Wind Farm (Germany)

nkt cables has entered a contract with E.ON Climate & Renewables Central Europe GmbH at a value of around € 20 million for the offshore wind farm Amrumbank West. For nkt cables, Amrumbank West will be another project with armoured 33 kV submarine cables. The cable will be manufactured at the product

1 minutes read
  • LinkedIn
  • X
  • Email

nkt cables has entered a contract with E.ON Climate & Renewables Central Europe GmbH at a value of around € 20 million for the offshore wind farm Amrumbank West.

For nkt cables, Amrumbank West will be another project with armoured 33 kV submarine cables. The cable will be manufactured at the production facilities in Cologne.

The German wind farm Amrumbank West will be situated in the North Sea Region, north of Helgoland and west of Amrum. The Amrumbank West wind farm consists of 80 wind turbines of 3.6 MW each.

The inner park array cabling shall be realised in 12 lines which are connected to 33 kV medium voltage switchgear on offshore substations.

The offshore substation shall transform the voltage to the level of 155 kV and transmit the power of up to 288 MW to the high voltage cable termination point on this substation.

With this project nkt cables again sets a landmark for infield cable solutions (33 kV with up to 90 km system length).

[mappress]

Offshore WIND staff, December 15, 2011; Image: nftcables

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago