offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Gardline Completes Marine Soil Investigation for Innogy Nordsee 1 (Germany)
News

December 23, 2011 · about 14 years ago

Gardline Completes Marine Soil Investigation for Innogy Nordsee 1 (Germany)

At the request of Innogy Nordsee 1 GmbH, Gardline Geosciences Limited performed a marine soil investigation for the proposed offshore wind farm Innogy Nordsee 1 which is located off the German coastline and 40 km to the north of the island of Juist. The projected area of the proposed site was 145.6k

1 minutes read
  • LinkedIn
  • X
  • Email

At the request of Innogy Nordsee 1 GmbH, Gardline Geosciences Limited performed a marine soil investigation for the proposed offshore wind farm Innogy Nordsee 1 which is located off the German coastline and 40 km to the north of the island of Juist.

The projected area of the proposed site was 145.6km². The objective of the preliminary geotechnical investigation was to provide a detailed geotechnical verification of the ground conditions at the proposed turbine locations.

The geotechnical operations were conducted from the MV Ocean Discovery, an anchored and DP1 vessel permanently mobilised for geotechnical investigations. The vessel arrived on site on 31 August 2011 and completed the full scope of work plus a number of additional deeper boreholes, cone penetration tests and downhole geophysical logging. A combination of on-board laboratory testing and real time processing of data enabled a quick turn around of results to the client’s engineer.

Gardline Business Development Director Andy Barwise said “I’m pleased that we’ve completed this project ahead of time, on budget and having obtained high quality data with a good end result – a happy client”

[mappress]

Offshore WIND staff, December 23, 2011; Image: rwe

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago