offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Wind Turbine Safety Increase with Industry Expansion (USA)
News

December 26, 2011 · about 14 years ago

Wind Turbine Safety Increase with Industry Expansion (USA)

Wind energy has begun to lead the way in alternative energy solutions. Manufacturers of wind turbines face challenges such as reducing downtimes and maintenance work. Some of the demands placed on turbine components include extreme temperature conditions, vibration, oscillation and aggressive offsho

2 minutes read
  • LinkedIn
  • X
  • Email

Wind energy has begun to lead the way in alternative energy solutions. Manufacturers of wind turbines face challenges such as reducing downtimes and maintenance work. Some of the demands placed on turbine components include extreme temperature conditions, vibration, oscillation and aggressive offshore air composition.

Keeping wind turbines safely operating is becoming increasingly important as more windmills are built and America begins to use wind as larger source of energy heading into the future.

In the event of a management failure or the failure of individual components, the configurable control system PNOZmulti from Pilz guarantees that the wind turbine is brought to a safe condition for both human and machine. Some of the safe monitoring functions include: emergency stop pushbutton, master low voltage switch, oil pressure protection and hermetic protection for the medium voltage transformer, and pitch system. Additional safe monitoring functions include: limit values for true power, vibration, generator speed, rotor speed and line transposition (monitoring of azimuth position) and signals from the fire detection system.

All the safety functions are created directly on the PC with the PNOZmulti Configurator and can be stored on a chip card and downloaded to the base unit.

By differentiating the reaction to various operational circumstances, the PNOZmulti can clearly reduce the load on mechanical wearing parts. A safe condition for both humans and wind turbine can be achieved by reducing the rotor speed and preventing all movements or by switching off hazardous voltages, provided these are not required for the safety function. With PNOZmulti, manufacturers can avoid unnecessary downtimes and thus increase the cost effectiveness of their wind turbines.

PNOZmulti is available in a coated version for use under extreme environmental conditions. This version can be used in extended temperature ranges, permits condensation and is resistant to aggressive air composition. Also, the configurable control system PNOZmulti can communicate via all relevant fieldbus systems. With PNOZmulti, applications can achieve up to Performance Level (PL) e of EN ISO 13849-1 and Safety Integrity Level (SIL) CL 3 of IEC 62061. PNOZmulti is certified worldwide.

Another benefit of the PNOZmulti is that the user program is password protected, enabling manipulation protection to be differentiated – with a range of access levels for maintenance staff and installation engineers.

[mappress]

Offshore WIND staff, December 26, 2011; Image: pliz

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago