offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Frogman Corps Detonate Mine at Anholt Offshore Wind Farm Site (Denmark)
News

January 5, 2012 · about 14 years ago

Frogman Corps Detonate Mine at Anholt Offshore Wind Farm Site (Denmark)

In 2010, DONG Energy performed detailed geophysical surveys of the seabed in the wind farm area. In connection with the surveys, a few objects with magnetic signs, indicating that it might be old bombs, were located.. In connection with the surveys, a few objects with magnetic signs, indicating that

1 minutes read
  • LinkedIn
  • X
  • Email

In 2010, DONG Energy performed detailed geophysical surveys of the seabed in the wind farm area. In connection with the surveys, a few objects with magnetic signs, indicating that it might be old bombs, were located..

In connection with the surveys, a few objects with magnetic signs, indicating that it might be old bombs, were located. Further surveys confirmed the presumptions; the find turned out to be two old mines from World War II – each containing approx 400kg undetonated explosives.

One of the mines was situated close to the substation where the cables from the wind turbines will be connected, and the other mine was situated in the centre of the wind farm area. Both mines were visible on the seabed at a water depth of approx 16 metres.

DONG Energy reported the find to the authorities, and after a diving inspection, the mines were classified as high-risk mines. In such a situation, the Admiral Danish Fleet is responsible for removal of the mines and decided to send out the Frogman Corps to detonate the mines.

[mappress]

Offshore WIND staff, January 05, 2012; Image: dongenergy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago