offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Cable Installation at London Array Faces Delay (UK)
Grid Connection

January 11, 2012 · about 14 years ago

Cable Installation at London Array Faces Delay (UK)

Cable installation at London Array, 1GW offshore wind farm, has been delayed as a result of the bad weather and shallow waters at the construction site, reports Windpower Monthly. With Global Marine’s Jan Steen, Atlantis and Sovereign vessels charter suspension, London array has called in more insta

1 minutes read
  • LinkedIn
  • X
  • Email

Cable installation at London Array, 1GW offshore wind farm, has been delayed as a result of the bad weather and shallow waters at the construction site, reports Windpower Monthly.

With Global Marine’s Jan Steen, Atlantis and Sovereign vessels charter suspension, London array has called in more installation vessels that can operate in shallow waters.

Global Marine’s cable storage barge Explorer, VSMC’s Stemat 82 and Stemat 87 will commence cable installation this month.

The array cables will connect the wind turbines to each other and to the offshore substations. They will each measure between 650m and 1,200m in length. For Phase One, they will lay 209km of array cabling in total.

[mappress]

Offshore WIND staff, January 11, 2012; Image:vsmc

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago