offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Cape Wind Unlikely to Start with Production by Mid-2015 (USA)
News

January 16, 2012 · about 14 years ago

Cape Wind Unlikely to Start with Production by Mid-2015 (USA)

New England’s power grid manager said that the Cape Wind offshore wind project is unlikely to start producing electricity by mid-2015, even though Cape Wind officials think otherwise, reports The Associated Press. Proposed in 2001, Cape Wind is still seeking buyers for the unsold half of its power.

1 minutes read
  • LinkedIn
  • X
  • Email

New England’s power grid manager said that the Cape Wind offshore wind project is unlikely to start producing electricity by mid-2015, even though Cape Wind officials think otherwise, reports The Associated Press.

Proposed in 2001, Cape Wind is still seeking buyers for the unsold half of its power.

For the sold part of projects power, the timeline plays a great role.

According to the contract Cape wind must begin the construction by December 31, 2013, and commence the power production by December 31, 2015.

These dates can be extended, but the developers would have to pay a non-refundable security deposit of about $2.3 million.

[mappress]

Offshore Wind Staff, January 16, 2012 ; Image: capewind

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago