offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›EWEA Reports Stable Offshore Wind Market in 2011 (Belgium)
News

January 19, 2012 · about 14 years ago

EWEA Reports Stable Offshore Wind Market in 2011 (Belgium)

2011 was a stable year for the offshore wind industry with 235 new offshore wind turbines grid connected, worth approximately 2.4 billion Euros. Today the European Wind Energy Association (EWEA) published its annual offshore wind statistics for 2011 in Brussels showing that 235 new turbines with a t

2 minutes read
  • LinkedIn
  • X
  • Email

2011 was a stable year for the offshore wind industry with 235 new offshore wind turbines grid connected, worth approximately 2.4 billion Euros.

Today the European Wind Energy Association (EWEA) published its annual offshore wind statistics for 2011 in Brussels showing that 235 new turbines with a total power capacity of 866 Megawatts (MW) were fully grid connected across nine offshore wind farms.

Annual installed new offshore wind turbine capacity (fully grid connected)

2008 2009 2010 2011

327 MW 584 MW 883 MW 866 MW

Nine offshore wind farms currently under construction will bring online an additional 2375 MW – increasing the EU’s total installed offshore wind power capacity by 62%.

Across the EU, a total of 1371 offshore turbines have now been grid connected, with a total power capacity of 3813 Megawatts in 53 wind farms in 10 European countries.

EWEA’s target for installed EU offshore wind power capacity by 2020 is 40,000 MW, producing approximately 4% of the EU’s total electricity consumption.

“ The offshore wind sector witnessed a stable market in 2011 ”, said Justin Wilkes, Policy Director of EWEA . He added: “ Despite the economy-wide financial squeeze, 2011 saw a 40 per cent increase on the previous year in offshore non-recourse debt financing , up from 1.46 billion Euros in 2010 to 2.05 billion Euros in 2011. ”

“ The strong project pipeline and financial developments highlight the importance of countries continuing to provide and develop stable long-term frameworks for offshore wind power in order to allow the industry to continue its development, ” he went on.

The majority (87%) of all newly installed and grid connected offshore wind power in 2011 was in British waters. Siemens supplied 80% of the MW installed offshore last year while SSE and RWE Innogy were the most active developers and DONG Energy continued to be the most active equity player in offshore wind power.

[mappress]

Offshore Wind Staff, January 19, 2012

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago