offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Secretary Huhne to Inaugurate Wold’s Largest Offshore Wind Farm (UK)
News

January 23, 2012 · about 14 years ago

Secretary Huhne to Inaugurate Wold’s Largest Offshore Wind Farm (UK)

On the February 9th, 2012, the world’s largest offshore wind farm, located in the East Irish Sea, will be inaugurated by Secretary of State for Energy and Climate Change The Rt. Hon. Chris Huhne, MP. Barrow-in-Furness Town Hall will be the gravitation point for this grand celebration marking a miles

1 minutes read
  • LinkedIn
  • X
  • Email

On the February 9th, 2012, the world’s largest offshore wind farm, located in the East Irish Sea, will be inaugurated by Secretary of State for Energy and Climate Change The Rt. Hon. Chris Huhne, MP.

Barrow-in-Furness Town Hall will be the gravitation point for this grand celebration marking a milestone to the Cumbria County and expansion of renewable generation in the UK having the potential to power more than 320,000 British homes with carbon neutral electricity.

Walney 2 came on stream November 1st, 2011, and was installed within only 5 months and 13 days. This is the fastest construction of an offshore wind farm ever carried out by any offshore wind power operator. The last turbine blade was installed on 22 September.

The Walney Offshore Windfarms

The Walney Offshore Windfarms project is located approximately 15km west of Barrow-in-Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 – 3.6MW turbines, giving a total capacity of the Walney project of 367.2MW. The rotor diameter of the turbines is 107m for Walney 1 and 120m for Walney 2, with a maximum height of 150m from blade tip to sea level. The total area of the development is some 73km2.

[mappress]

Offshore WIND staff, January 23, 2012; Image: dongenergy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago