offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Windy Weather Affects Progress on Walney 2 (UK)
News

January 23, 2012 · about 14 years ago

Windy Weather Affects Progress on Walney 2 (UK)

The progress on Walney 2 is still dramatically affected by the windy weather, which has lasted for several months. The commissioning of the turbines requires a number of technician visits to each turbine in order to secure all settings and that communication is in a proper order. For safety reasons,

1 minutes read
  • LinkedIn
  • X
  • Email

The progress on Walney 2 is still dramatically affected by the windy weather, which has lasted for several months. The commissioning of the turbines requires a number of technician visits to each turbine in order to secure all settings and that communication is in a proper order.

For safety reasons, the visits are generally restricted to take place at a significant wave height below 1.2 metres, provided the wind and current are acceptable; however, during last couple of months, the weather windows, where personnel transfer to the turbines is possible, have been very limited.

According to statistics, offshore activities in the winter are more unlikely than in the summer months, but this winter has been much worse than the statistical average.

Statistically the wave should be above 1.5 metres approx. 30 percent of the time in December. December 2011 this has been the case in approx. 75 percent of the time.

[mappress]

Offshore WIND staff, January 23, 2012; Image: dong energy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago