offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›MaRINET Marine Renewables Infrastructure Network (UK)
News

January 26, 2012 · about 14 years ago

MaRINET Marine Renewables Infrastructure Network (UK)

MARINET (Marine Renewables Infrastructure Network), is a €9 million EU funded FP7 project which aims to accelerate the development of marine renewable energy (wave, tidal and offshore wind) by coordinating marine research and development at all scales (small models through to prototype scales from l

1 minutes read
  • LinkedIn
  • X
  • Email

MARINET (Marine Renewables Infrastructure Network), is a €9 million EU funded FP7 project which aims to accelerate the development of marine renewable energy (wave, tidal and offshore wind) by coordinating marine research and development at all scales (small models through to prototype scales from laboratory through to open sea tests) and allowing researchers and developers access to specialist marine renewable energy centres across Europe.

What Narec will offer

Narec will provide 49 weeks of access to its testing facilities for marine prototype testing, tidal turbine drive train (3MW capacity) and electrical grid integration. The project offers significant contribution towards the costs of the test (up to €17,276 per week plus up to €1,000 travel and expenses allowance for each user group).

Narec facilities available for use under the project include:

Timeframe and access

There will be at least four calls for applications over the next four years (April 2011-Marc 2015).

Call 1 – The first call is open now until 29th Feb 2012 with access to facilities commencing May 2012.

Call 2 – The second call will open in July 2012 and close on the 26th September 2012.

[mappress]

Offshore WIND staff, January 26, 2012; Image: narec

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago