offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Rotork Valve Actuation Supports Borwin Alpha Platform (Germany)
News

January 26, 2012 · about 14 years ago

Rotork Valve Actuation Supports Borwin Alpha Platform (Germany)

The Borwin Alpha platform is the first offshore installation designed to convert AC power into high voltage direct current (HVDC) for onward transmission. Built and designed by the Heerema Fabrication Group on behalf of ABB, the facility can transfer a power of 400MW at a bipolar voltage of 150kV. T

2 minutes read
  • LinkedIn
  • X
  • Email

The Borwin Alpha platform is the first offshore installation designed to convert AC power into high voltage direct current (HVDC) for onward transmission. Built and designed by the Heerema Fabrication Group on behalf of ABB, the facility can transfer a power of 400MW at a bipolar voltage of 150kV.

The converted current is carried by a 200 kilometre cable for onshore connection to the European power grid.

The BARD Offshore 1 wind farm that is served by the Borwin Alpha platform is situated 100 kilometres northwest of the German island of Borkum. Eighty wind turbines will be installed when the farm is completed in 2012. The 200 kilometre cable connection to the mainland is the longest in the world for an offshore wind farm, as well as the first to utilise HVDC transmission.

The majority of the Rotork IQTPro actuators are controlling the operation of butterfly valves in applications on the cooling plant for the power conversion plant and the fuel systems for emergency generators. Some of the valves are installed within the platform superstructure whilst others are outside and exposed to the harsh North Sea environment. Reliable operation is enhanced by the double-sealed actuator enclosure design, combined with non-intrusive commissioning and data transfer technologies that permanently eliminate the need to remove any covers once the actuators are wired-up. Rotork IQTPro actuators also incorporate increased functionality features as standard for improved long term asset management. For example, an integral data logger stores historical operating data, including the sequence of valve torque profiles. This information can be downloaded and analysed with Rotork’s PC-based IQ-Insight software to establish predictive maintenance schedules or identify potential problems.

[mappress]

Offshore WIND staff, January 26, 2012; Image: rotork

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago