offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›RWE NPower Renewables Changes Plans on Wind Farm Grid Connection (UK)
Wind Farm Update

January 30, 2012 · about 14 years ago

RWE NPower Renewables Changes Plans on Wind Farm Grid Connection (UK)

RWE NPower Renewables has changed their plans for connecting a 1,2 GW wind farm to the grid. They initially planned to bring power to the grid trough a 50 mile network of pylons across East Lindsey. The National Grid gave the company an offer to connect the wind farm to the existing electricity tran

1 minutes read
  • LinkedIn
  • X
  • Email

RWE NPower Renewables has changed their plans for connecting a 1,2 GW wind farm to the grid.

They initially planned to bring power to the grid trough a 50 mile network of pylons across East Lindsey.

The National Grid gave the company an offer to connect the wind farm to the existing electricity transmission network at the Bicker Fen substation with an underground direct current (DC) cable.

In 2003, RWE NPower renewables was awarded a license to develop a 1,200 megawatt (MW) offshore wind farm called Triton Knoll. The wind farm is located off the east coast of England, approximately 20 miles off the coast of Lincolnshire and 28 miles from the coast of North Norfolk.

[mappress] Offshore Wind Staff, January 30, 2012; Image: RWE

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago