offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›DanTysk to Certify All Offshore Wind Farm Components (Germany)
News

February 10, 2012 · about 14 years ago

DanTysk to Certify All Offshore Wind Farm Components (Germany)

DanTysk Offshore Wind GmbH, Hamburg, intends to build an offshore windfarm in the North Sea. In the first construction phase they are planning to build 80 wind turbines with a total output of 288 MW, an offshore substation and an offshore accommodation platform. The project is located in the German

1 minutes read
  • LinkedIn
  • X
  • Email

DanTysk Offshore Wind GmbH, Hamburg, intends to build an offshore windfarm in the North Sea.

In the first construction phase they are planning to build 80 wind turbines with a total output of 288 MW, an offshore substation and an offshore accommodation platform. The project is located in the German Bight area, around 75 km to the west of the Island of Sylt, directly on the border between Germany and Denmark. The size of the area is approximately 71 km² with the water depth between 21 and 32 m.

The project is fully permitted with the first BSH release obtained in December 2010. The second BSH release will be submitted in several packages (turbine, tower and foundation clusterwise, substation, cable and accommodation platform). These packages will be submitted between December 2011 and approximately May 2012.

The scope of work covers the project certification for all components of the DanTysk Offshore windfarm starting after the second BSH release and covering the phases from preparation of the manufacturing until commissioning.

All the works shall be executed in accordance with the permit, the BSH standards and the first and second release. The above mentioned components are as follows:

[mappress]

Offshore WIND staff, February 10, 2012; Image: van oord

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago