offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›New AMI Consulting Report Details Materials Usage in Wind Turbine Blades (UK)
News

February 15, 2012 · about 14 years ago

New AMI Consulting Report Details Materials Usage in Wind Turbine Blades (UK)

A report from industry consultants, AMI Consulting, published in January 2012, calculates that the global demand for materials in the production of wind turbine blades grew by over 20% per annum in the last five years. The market for wind turbine blades has been one of the fastest growing of any com

2 minutes read
  • LinkedIn
  • X
  • Email

A report from industry consultants, AMI Consulting, published in January 2012, calculates that the global demand for materials in the production of wind turbine blades grew by over 20% per annum in the last five years.

The market for wind turbine blades has been one of the fastest growing of any composite application with strong growth in Europe, North America and more recently Asia. While global materials usage has risen strongly, there are uncertainties ahead and changing market dynamics. In many parts of the world governmental support for wind energy is weakening due to budgetary constraints with consequences both for generation capacity and the distribution network, yet the long term prospects remain encouraging.

In this new report by AMI Consulting the value of the global composite blade market is estimated at €4 billion in 2011 of which approximately €1.5 billion was raw materials. The report quantifies the market, its structure, the status of the technology and the changes which are underway.

Increasing effort is being invested in designing blades for maximum power generation and this requires careful attention to material composition, material processing and of course overall design. The link between generating capacity, blade size and materials usage is discussed in detail in the report. To maximise return on investment, the average blade size is getting longer and heavier requiring greater quantities of raw materials. As blade length and weight increase beyond current norms increased sophistication in blade design, materials and manufacture are required.

By providing independent quantitative analysis, subscribers will gain a much stronger understanding of the scale of the market and the market share of the key participants.

[mappress]

Offshore WIND staff, February 15, 2012

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago