offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Construction Starts on Narec’s Wind Turbine Drive Train Testing Facility (UK)
News

February 16, 2012 · about 14 years ago

Construction Starts on Narec’s Wind Turbine Drive Train Testing Facility (UK)

Piling has started on the site of a new £35m wind turbine drive train testing facility at Narec in Northumberland. 292 piles will be drilled to 19m deep, ranging from 450mm diameter to 900mm diameter. When commissioned in summer 2013, the 15MW capacity test facility will be the most advanced of its

2 minutes read
  • LinkedIn
  • X
  • Email

Piling has started on the site of a new £35m wind turbine drive train testing facility at Narec in Northumberland. 292 piles will be drilled to 19m deep, ranging from 450mm diameter to 900mm diameter. When commissioned in summer 2013, the 15MW capacity test facility will be the most advanced of its type in the world, providing 6 degrees of freedom for applying load forces.

To provide sufficient support for the rig, a 43-metre by 12-metre test bed foundation will be constructed to a depth of 4m. This will be contained within a 32-metre high steel framed building constructed with 1300 tonnes of steel. The access door is 20m x 20m and 2 x 250 T cranes will lift test pieces into place.

Tony Quinn, Director of Major Projects and Assets at Narec , said: “ It’s great to see works starting on site for this world-leading facility, which will accelerate technology development and time to market for the UK offshorewind industry. It will provide Narec with a controlled environment to test the next generation of offshore turbines in accordance with international standards, before they are deployed in large numbers offshore. ”

The Energy Technologies Institute (ETI) is investing £25m in the Narec facility, by providing funding to GE Energy – Power Conversion and MTS Systems Corporation for the design, development and commissioning of the test rig.

Dr David Clarke, ETI Chief Executive , said: “ The test rig that will be housed on the Narec site is the biggest project to date commissioned by the ETI and has seen us invest over £25m in its design, development and commissioning. It will be a world leading large-scale engineering project and we look forward to the site being developed and taking shape over the next few months .”

One North East invested £10 million in the building to house the rig.

[mappress] Offshore Wind Staff , February 16, 2012; Image: narec

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago