offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›First Tripod Loaded onto OFFSHORE BHV I (Germany)
Technology

February 22, 2012 · about 14 years ago

First Tripod Loaded onto OFFSHORE BHV I (Germany)

The first foundation structures for offshore wind energy facilities were loaded onto the special pontoon OFFSHORE BHV I, which is 70 meters long and 32 meters wide, in Bremerhaven’s Fischereihafen on February 14. Weighing up to 900 tons, the tripods will be transported by rail directly from the load

1 minutes read
  • LinkedIn
  • X
  • Email

The first foundation structures for offshore wind energy facilities were loaded onto the special pontoon OFFSHORE BHV I, which is 70 meters long and 32 meters wide, in Bremerhaven’s Fischereihafen on February 14.

Weighing up to 900 tons, the tripods will be transported by rail directly from the loading facility at the manufacturer’s plant to the pontoon. This will be followed by shipment to the ABC peninsula set up specially for this purpose at the BLG Auto Terminal and temporary storage until the tripods are loaded onto the installation vessels designed to install them at sea.

BLG recently received the order for transport and storage of 70 tripods for the wind farms “Borkum West II“ and “Global Tech I“ from the manufacturer, Weserwind Offshore Construction. The heavy-duty pontoon OFFSHORE BHV 1 is a key element in BLG’s chain of logistics services for the rapidly growing offshore wind energy sector. BLG offers holistic logistics solutions for managing supply chains for wind turbines, from procurement to production right through to installation at sea.

[mappress]

Offshore WIND staff, February 22, 2012; Image: BLG

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

20 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

20 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

20 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

20 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago