offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›UK: SMart Wind, DONG Energy Propose HVAC and HVDC for Project One
Grid Connection

March 19, 2012 · about 14 years ago

UK: SMart Wind, DONG Energy Propose HVAC and HVDC for Project One

DONG Energy requires full technical and economic flexibility to deliver against government targets for offshore wind cost reduction. Therefore, SMart Wind and DONG Energy are now including the option to connect Project One to the National Grid using either High Voltage Alternating Current (HVAC) or

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy requires full technical and economic flexibility to deliver against government targets for offshore wind cost reduction. Therefore, SMart Wind and DONG Energy are now including the option to connect Project One to the National Grid using either High Voltage Alternating Current (HVAC) or High Voltage Direct Current (HVDC) technology.

Since HVAC technology has not been considered to date in the scoping or consultation processes for Project One, SMart Wind are proposing the following steps:

In advance of issuing the above information, Smart Wind reassures the onshore cable route will remain as a buried cable and no overhead lines are being considered for the entire 40km length of the onshore cable route from the landfall at Horseshoe Point to the onshore converter station at Killingholme.

[mappress]

Offshore WIND staff, March 19, 2012; Image: britned

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago