offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›UK: Dong Energy’s Wind Turbine Cable Plans Given Thumbs Up
Grid Connection

March 22, 2012 · about 14 years ago

UK: Dong Energy’s Wind Turbine Cable Plans Given Thumbs Up

Tendring Council has approved the Dong Energy’s plans to lay cables for two test wind turbines, according to Clacton Gazette. The cable will connect wind turbines at the Gunfleet Sand wind farm to the substation at the Veolia Water Site. It will surface at Clacton’s Martello Bay coach park. Gunfleet

1 minutes read
  • LinkedIn
  • X
  • Email

Tendring Council has approved the Dong Energy’s plans to lay cables for two test wind turbines, according to Clacton Gazette.

The cable will connect wind turbines at the Gunfleet Sand wind farm to the substation at the Veolia Water Site. It will surface at Clacton’s Martello Bay coach park.

Gunfleet Sands Offshore Wind Farm consists of two phases, Gunfleet Sands 1 and 2. The wind farm reached full production during the spring of 2010.

The total capacity of the offshore wind farm is 172MW. Gunfleet Sands 1 consists of 30 turbines each of 3.6MW and Gunfleet Sands 2 consists of 18 turbines each with a capacity of 3.6MW.

[mappress]

Offshore WIND staff, March 22, 2012

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago