offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Technology to Build and Operate Supergrid Available Today
Grid Connection

March 23, 2012 · about 14 years ago

Technology to Build and Operate Supergrid Available Today

As announced at the inaugural conference “Supergrid 2012” on 21 March, FOSG has released a Roadmap on the technological challenges for Supergrid. There are no technology “show-stoppers” to the development of a European Supergrid. For visionary long term planning the availability of key VSC-Grid tech

1 minutes read
  • LinkedIn
  • X
  • Email

As announced at the inaugural conference “Supergrid 2012” on 21 March, FOSG has released a Roadmap on the technological challenges for Supergrid.

There are no technology “show-stoppers” to the development of a European Supergrid. For visionary long term planning the availability of key VSC-Grid technologies, such as control and protection methods, main circuit design, grid master control, offshore operation experience and selective fault clearance techniques like DC breakers, can be assumed. This should give confidence to specify grid-enabled point-to-point connections that could be expanded to multi-terminal building blocks for a larger overlaid grid. The critical time-line for introduction of new technology lies primarily in solution of non-technical issues, such as harmonization of Grid Codes, regulatory procedures and revenue models that will create a strong market growth and technology push.

[mappress]

Offshore WIND staff, March 23, 2012

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago