offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›UK: Visser & Smit Completes Cable Laying at Sheringham Shoal
Grid Connection

March 23, 2012 · about 14 years ago

UK: Visser & Smit Completes Cable Laying at Sheringham Shoal

Cable laying at the Sheringham Shoal Offshore wind farm in the Greater Wash has been completed, reports renews Europe. Visser & Smit has installed a total of 56km of infield cables by utilizing the 86m vessel Team Oman, which has been deployed at the site for 18 months. The cable will now be trenche

1 minutes read
  • LinkedIn
  • X
  • Email

Cable laying at the Sheringham Shoal Offshore wind farm in the Greater Wash has been completed, reports renews Europe.

Visser & Smit has installed a total of 56km of infield cables by utilizing the 86m vessel Team Oman, which has been deployed at the site for 18 months. The cable will now be trenched into the seabed with the 87m Toisa Warrior to ensure it is protected from fishing gear, vessel anchors and other potential hazards. Completion of burial is scheduled for this summer.

The wind farm, which is being constructed by Scira partners Statkraft and Statoil, has 36 of its 88 turbines installed and is set to be completed in late summer 2012.

[mappress]

Offshore WIND staff, March 23, 2012; Image: vsmc

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago