offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›The Netherlands: Windcat Workboats Launches 18m Aluminium Catamaran
News

March 26, 2012 · about 14 years ago

The Netherlands: Windcat Workboats Launches 18m Aluminium Catamaran

Windcat Workboats launched Windcat 28 this month. Windcat 28 is a vessel in the MK 3 series, an 18m aluminium catamaran specifically designed for the offshore wind industry which was built in Kuipers Woudsend ship yard in the Netherlands. Windcat 28 is 18.0m in length over all and has a beam of 6.1m

2 minutes read
  • LinkedIn
  • X
  • Email

Windcat Workboats launched Windcat 28 this month. Windcat 28 is a vessel in the MK 3 series, an 18m aluminium catamaran specifically designed for the offshore wind industry which was built in Kuipers Woudsend ship yard in the Netherlands.

Windcat 28 is 18.0m in length over all and has a beam of 6.1m and a draft of 1.8m. She is powered by two MTU 2000 M72 V8 engines driving variable pitched propellers giving a maximum speed of 30 knots and service speed of 27 knots combining high performance with fuel economy.

Windcat 28 is built according to MCA SCV code category 2, GL class (GL + 100A5 HSDE III Workboat MC Overbar). She is the second Windcat to be GL classified and meets all the German flag state requirements, so able work in German and other northern European waters.

All the vessel’s navigation and radio equipment is Wheelmarked (MED certified). The vessel is equipped with double radar, ECDIS, AIS, GPS, auto pilot and a GPS compass and double VHF, Navtex etc. The vessel can carry up to 12 passengers and 2 crew and has the capacity to carry up to 2.5 tonnes of cargo on the foredeck.

Windcat 28 will be starting work immediately on the Greater Gabbard Wind Farm before departing for Oostende for the commissioning of Thornton Bank Phase II Offshore Wind Farm in Belgium next month.

[mappress]

Offshore WIND staff, March 26, 2012; Image: Windcat Workboats

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago