offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›UK: HSSE Completes London Array Export Cable Shore Landing
Grid Connection

April 4, 2012 · about 14 years ago

UK: HSSE Completes London Array Export Cable Shore Landing

Bootle-based commercial diving and engineering specialist, Hughes Sub Surface Engineering, announced the successful completion of their latest project assisting the main contractor successfully complete the shore landing of the export cable from the London Array Wind Farm presently under constructio

1 minutes read
  • LinkedIn
  • X
  • Email

Bootle-based commercial diving and engineering specialist, Hughes Sub Surface Engineering, announced the successful completion of their latest project assisting the main contractor successfully complete the shore landing of the export cable from the London Array Wind Farm presently under construction in the Thames Estuary.

Hughes Sub Surface Engineering were engaged to assist with the landing and burial of the export cable at a demanding location close to the mouth of the River Swale, to the south east of the Isle of Sheppey in Kent. For the past 6 months their specialist team provided 24/7 support to the project assisting with the deployment and operation of the burial plough, the successful removal of lift-bags and the sea serpent, cutting and retrieval of the cable and a range of near-shore wet-rigging tasks.

Re-affirming the company’s growing reputation as a provider of specialist diving, rigging and engineering services to the offshore wind farm construction sector Ian Hughes, MD, said: ‘Our unique blend of skills, knowledge and experience in this demanding arena, coupled with our ability to provide innovative solutions to the range of challenges always present on these projects enabled our client to successfully complete this demanding shore landing and cable burial’.

[mappress]

Offshore WIND staff, April 04, 2012; Image: hsse

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

24 days ago