German wind farm developer, DC Netz BorWin3 GmbH is inviting tenders for installation of a system for the transmission of electrical energy (about 900 MW) between offshore wind farms in the BorWin clusters and a network connection point on land.
In particular, the transmission power, the losses, the availability and compliance with the Grid Code as requirements for this power transmission system can be defined.
