offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Denmark: Anholt Substation Scheduled for Operation on 1 August 2012
News

May 3, 2012 · about 14 years ago

Denmark: Anholt Substation Scheduled for Operation on 1 August 2012

At Easter, Energinet.dk’s approximately 1600 tonnes heavy top section for the offshore substation was hoisted into position with assistance from a Dutch crane vessel. The substation platform will connect the 111 wind turbines in the Anholt Offshore Wind Farm to the Danish power grid. On Good Friday

1 minutes read
  • LinkedIn
  • X
  • Email

At Easter, Energinet.dk’s approximately 1600 tonnes heavy top section for the offshore substation was hoisted into position with assistance from a Dutch crane vessel. The substation platform will connect the 111 wind turbines in the Anholt Offshore Wind Farm to the Danish power grid.

On Good Friday 6 April 2012, the platform was installed on the foundation, and subsequently the three transformers were hoisted into position on the platform by A2SEA’s newly upgraded installation vessel Sea Power. The transformers are to step up the voltage from the offshore wind turbines’ 33kV to 22kV before the power is sent to the power grid onshore through a submarine cable.

The substation is scheduled for operation on 1 August 2012.

[mappress]

Offshore WIND staff, May 03, 2012; Image: dongenergy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago