offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›USA: Cape Wind Calls for Support at Final Public Hearings
News

May 18, 2012 · about 14 years ago

USA: Cape Wind Calls for Support at Final Public Hearings

As Cape Wind is coming closer to its finalisation,it calls for public support at the last set of public hearings which will be held in Massachusetts. The Department of Public Utilities (DPU) public hearings on NSTAR’s contract to purchase 27.5 % of Cape Wind’s power will be held on May 30 in Boston.

1 minutes read
  • LinkedIn
  • X
  • Email

As Cape Wind is coming closer to its finalisation,it calls for public support at the last set of public hearings which will be held in Massachusetts.

The Department of Public Utilities (DPU) public hearings on NSTAR’s contract to purchase 27.5 % of Cape Wind’s power will be held on May 30 in Boston. The DPU approved National Grid’s contract to purchase 50% of Cape Wind’s power two years ago. These two contracts allow Cape Wind to get closer to the construction stage, which will pave the way for creation of 600 – 1,000 jobs.

The project’s opponents claim that this contract will cause electric bills to increase. However, as stressed by Cape Wind, the bill impact will be about USD 1 a month for the usual residential customer and no more than a 1% to 2% bill increase for any NSTAR customer. In comparison with the fossil fuel prices, it will save consumers’ money, says Cape Wind.

According to Charles River Associates, Cape Wind will have an impact on New England’s wholesale electric market prices that will decrease, and thus sum over USD 7 billion in savings over the life of the project.

The public hearings will be held in Natick on May 22, in Barnstable on May 23 and in Boston on May 30.

[mappress]

Offshore WIND staff, May 18, 2012; Image: Cape Wind

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago