offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›The Netherlands: Vos Prodect Tests Sealed Cable Hang-Off System Concept
News

May 29, 2012 · about 14 years ago

The Netherlands: Vos Prodect Tests Sealed Cable Hang-Off System Concept

In addition to the successfull realization of its cable hang-off system, Vos Prodect Innovations is looking for additional features to satisfy the new requirements of the offshore wind farm projects. Project developers are setting additional firm requirements that have to be met and relevant systems

1 minutes read
  • LinkedIn
  • X
  • Email

In addition to the successfull realization of its cable hang-off system, Vos Prodect Innovations is looking for additional features to satisfy the new requirements of the offshore wind farm projects.

Project developers are setting additional firm requirements that have to be met and relevant systems have to be qualified with product tests. The latest requirement from its clients is sealed cable hang-off systems for their specific projects.

Providing a cost efficient and proven sealed system will have an enormous cost saving effect against corrosion troubles inside the cable deck.

By realizing the importance of sealed cable hang-off systems, Vos Prodect Innovations has executed a concept test, which is successfully completed. The concept has been tested with a defined pressure, applied to the test setup over a period of 4 days.

The outcome of the concept testing is promising and the data collected from the test is within “water tight” leakage rate classifications. This concept test is a crucial step towards the sealed cable hang-off systems and can be implemented to any offshore wind farm project regardless of the cable type.

[mappress]

Offshore WIND staff, May 29, 2012; Image: Vos Prodect

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago