offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›USA: GL Presents at AWEA WINDPOWER 2012
News

June 1, 2012 · about 14 years ago

USA: GL Presents at AWEA WINDPOWER 2012

Maximizing the availability of every wind turbine has long been the idealistic goal for the North American wind industry – the assumption being that there is a correlation between optimum availability and financial return. New benchmarking studies by renewable energy consultancy GL Garrad Hassan, sh

2 minutes read
  • LinkedIn
  • X
  • Email

Maximizing the availability of every wind turbine has long been the idealistic goal for the North American wind industry – the assumption being that there is a correlation between optimum availability and financial return.

New benchmarking studies by renewable energy consultancy GL Garrad Hassan, show, however, that this is not always necessarily the case. In her presentation ‘What is the Cost of Availability?’ at AWEA WINDPOWER 2012 in Atlanta next week, Cathy Syme of GL Garrad Hassan will demonstrate the relationship between availability, operating cost and contribution margin.

“Historically many wind farm owners have focused primarily on turbine availability and, as a result, risked missing significant opportunities to improve their margins,” says Cathy Syme. “Our benchmarking studies over the last five years have shown that spending money on increasing availability does not necessarily lead to a corresponding financial benefit. The real opportunities for improved operational and financial performance tend to present themselves through the collection and analysis of data focused on the interaction between availability, efficiency and wind resource, and their combined impact on revenue and costs.”

Using many years of operational data gathered through the course of its consulting work, GL Garrad Hassan conducts benchmarking of projects on a per turbine or per MWh basis. The benchmarking covers performance, availability and costs, and the sample data take into account a variety of factors, such as the technologies in use and regional profiles of the installations. These benchmarking studies have already dispelled a number of wind industry myths: firstly, that when a wind farm is meeting its budgetary requirements it is also performing well; secondly, that spending money on increasing a turbine’s availability is always the smartest thing to do financially; and finally, that simply gathering a lot of wind farm data does not by itself lead to a greater understanding of wind farm performance.

[mappress]

Offshore WIND staff, June 01, 2012; Image: gl

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago