offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Denmark: Energinet Seeks Company for Krieger’s Flak and Horns Rev 3 Feasibility Studies
News

June 8, 2012 · about 14 years ago

Denmark: Energinet Seeks Company for Krieger’s Flak and Horns Rev 3 Feasibility Studies

Energinet is seeking a company to conduct feasibility studies, preparation of EIA report, related plan documents and draft environmental reports for offshore wind turbine project at Krieger’s Flak and Horns Rev 3. The wind farm is established at Krieger’s Flak, located in the Baltic Sea, approx. 20

1 minutes read
  • LinkedIn
  • X
  • Email

Energinet is seeking a company to conduct feasibility studies, preparation of EIA report, related plan documents and draft environmental reports for offshore wind turbine project at Krieger’s Flak and Horns Rev 3.

The wind farm is established at Krieger’s Flak, located in the Baltic Sea, approx. 20 km east of Mon. Landfall is expected in the north of Køge Bay with its endpoint at Ishøj 400kV station.

Kriegers Flak

Offer comprises carrying out feasibility studies both in the territorial sea for the construction of the wind farm and partly on land for the construction of cable systems and a possible extension.

In addition, states that an EIA report and related plan documents (municipality level increases and local plans) and delivered a draft environmental report.

Horns Rev 3

Offer comprises carrying out feasibility studies both in the territorial sea for the construction of the wind farm and partly on land for the construction of cable systems and a possible new station.

In addition, states that an EIA report and related plan documents (municipality level increases and local plans) and the draft environmental report will be required.

[mappress]

Offshore WIND staff, June 08, 2012; Image: energinet

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago